Construction of " Mahatma Jyotiba Fule " Railway Over bridge in lieu of L. C. no. 2 on Bhestan-Bhusaval loop line on Dindoli Main Road, Dindoli, Udhana, Surat (Under SJMMSVY)

01 Location : In lieu of L. C. no. 2 Bhusaval-Bhusaval loop line on Dindoli Main Road
02 River/ Nala/ Creek : Railway Over Bridge
03 Lane : Three Lane ( Up & Down )
04 Year of Construction : April-2014
05 Cost : Rs. 16,60,19,377=29 Paise
06 Details of Bridge :  
07 (i) Length of Bridge
(Between ends of Decking)
: In SMC area : 405.87
In Rly. area : 51.20 mt
Total   : 457.07 mt.
  (ii) Number of Span : 18
  (iii) Span Length : Span length Varying from 25.00 mt. to 31.00 mt.
  (iv) Carriage Way : 10.50 mt.
  (V) Width of Bridge : In SMC Area : 11.40 mt
In Rly Area : 12.75 mt
  (vi) Length of R.C.C.
Approaches &Returns
: Kharvasa Side  : 130.00 mt.
Dindoli Side : 110.00 mt.
08 (i) Design Discharge : N.A.
  (ii)  Design H.F.L. : N.A.
  (iii) Type of Bridge : Railway Over Bridge
  (iv) F.R.L. : 20.40 mt.
09 Structural Details    
  (i) Foundation : 1000 mm dia Pile Foundation with Pile Cap
  (ii) Substructure : Semi-Circular /Circular Pier
  (iii) Superstructure : Railway limit : Steel "I" girder & Deck slab
SMC limit: Pre-cast P.S.C."I" Girder & Deck slab
  (iv) General Items : Elastomeric type bearing, Modular type expansion joint,
RCC Anti crash Barrier & R.E. wall in approaches
10 Name of Contractor : Avdhoot Construction Co;Mehsana
11 Name of Design Consultant : Casad Consultant, Ahmedabad.
13 Name of Project Management Consultant : Multi Media Consultant Pvt Ltd., Ahmedabad
14 Name of Third Party Inspection : RITES Ltd, Mumbai
15 Name of Proof Check Consultant : SVNIT, Surat.