Skip to main content

EWS Housing

EWS Housing Scheme

Under National Housing Policy, the Central Government has decided to construct two million houses per year; predominantly benefiting the poor and the deprived.

Under the Chief Minister's 15 point development program and Government of India's 20 point program, the Government has given target to construct about 8954 EWS houses including target for the Year 2006-2007.

Year wise target given to the corporation for the scheme is as below:

Year No. of units
1999-2002 6304
2002-2003 700
2003-2004 300
2004-2005 250
2005-2006 200
2006-2007 1200
Total 8954

Brief Detail of the Scheme

Total Targetgiven by Government 8954
Total No. of Unit Constructed 7424
Allotment 3891 (Hutments are shifted)
3533 (By public Draw System)
Built up area 22.45 smt/unit
Income ceiling Gross family income upto Rs. 2500/- month
Unit Cost Rs.58,000/- before 26-1-2001
In case allotment done thro' draw
Beneficiary's contribution
Government subsidy
Loan component
Rs.18,000/-
Rs. 5,000/-
Rs.35,000/-
(Installment - Rs. 332/- for 15 years)
In case hutments are shifted
Beneficiary's contribution
Government subsidy
Loan component
SMC's without interest loan
Rs.1,000/-
Rs. 5,000/-
Rs. 35,000/-
Rs.17,000/-
(Installment - Rs. 332/- + 94/- = 426/- for 15 years)
Unit Cost Rs 68,000/- post earthquake
In case allotment done thro' draw
Beneficiary's contribution
Government subsidy
Loan component
Rs.28,000/-
Rs. 5,000/-
Rs.35,000/-
(Installment - Rs. 332/- for 15 years)
In case hutments are shifted
Beneficiary's contribution
Government subsidy
Loan component
SMC's without interest loan
Rs.1,000/-
Rs. 5,000/-
Rs. 35,000/-
Rs.27,000/-
(Installment - Rs. 332/- + 150/- = 482/- for 15 years)
Subsidy Received Surat Municipal Corporation received and passed to beneficiaries subsidy of Rs. 5000/- per dwelling unit. Total Subsidy is Rs. 3,71,20,000/- for 7424 units.
Salient Features One Room, Kitchen, W.C., Chowkdi, Balcony, Under ground and
Overhead water tank and all infra structure facilities like water
supply, drainage, street light, Road.

List of EWS Housing Projects- Completed

Please scroll/drag below block to view whole data
Sr. No. Location No. of units Plot Area sq.mt Expenditure incurred
Rs. in lacs (Only Const. Cost)
Remarks
North Zone - Katargam
1. T.P.Scheme No. 19 (Katargam) F.P.NO R - 19 160 2787.00 101.15 Units allotted to urban poors by draw
2. T.P.Scheme No.18 (Katargam) F.P.No. R - 141 224 5000.00 145.60 Units allotted to hutments
East Zone - Varachha
3. T.P.Scheme No.15 (Fulpada) F.P.No. 118 336 4875.00 171.73 Units allotted to urban poors by draw
4. T.P.Scheme No.15 (Fulpada) F.P.No. 119 160 3767.00 95.62
5. T.P.Scheme No.16 (Kapadra) F.P.No. 47 544 19731.00 326.24
6. T.P.Scheme No.16 (Kapadra) F.P.No. 46 96 3097.00 56.36
7. T.P.Scheme No.3 (Karanj) F.P.No. 38 528 9318.00 290.06 Units allotted to hutments
West Zone - Rander
8. T.P.Scheme No.10 (Adajan) F.P.No. 73 336 5672.00 176.03 Units allotted to urban poors by draw
9. T.P.Scheme No.13 (Adajan) F.P.No. 24 224 4155.00 140.71
10. T.P.Scheme No.13 (Adajan) F.P.No. 251 80 1713.00 52.81
11. T.P.Scheme No.13 (Adajan) F.P.No. 49 320 3021.00 208.78 Units allotted to hutments
12. T.P.Scheme No.42 (Jahangirabad) F.P.No. 94 240 3468.00 141.13 Units allotted to urban poors by draw
13. Moje Jahangirabad R.S No.37 256 4374.00 148.38 Units allotted to urban poors by draw and hutments
14. T.P.Scheme No.13 (Adajan) F.P.No. 19 272 4508.00 172.72 Units allotted to urban poors by draw
15. T.P.Scheme No.23 (Rander) F.P.No. 37 80 1155 48.36 units are allotted to hutments
South Zone - Udhana
16. T.P.Scheme No.2 (Udhana) F.P.No. 16 80 2119.00 41.91 Units allotted to urban poors by draw
17. T.P.Scheme No.2 (Udhana) F.P.No. 53 272 7205.00 142.50 Units allotted to hutments
18. T.P.Scheme No.21 (Bhestan) F.P.No. 51 paikee 752 17948.00 488.80
South East Zone - Athwa
19. T.P.Scheme No.7 (Anjana) F.P.No. 45 512 9354.00 321.66 Units allotted to hutments
South West Zone  - Athwa
20. T.P.Scheme No.6 (Piplod) F.P.No. 121 688 11297.00 370.22 Units allotted to urban poors by draw
21. T.P.Scheme No.4 (Umra - South) F.P.No. 129 480 10817.00 270.57 Units allotted to urban poors by draw
22. T.P.Scheme No.4 (Umra - South) F.P.No. 134 704 12823.00 393.72 Units allotted to hutments
23. T.P.Scheme No.4 (Umra - South) F.P.No. 90 80 1392.00 45.71
Total 7424 1,49,596.00 4350.77  

List of EWS Housing ongoing (MMGY) Projects

Please scroll/drag below block to view whole data
No. Project Site Detail No. of units No of Contractor Date of
Work Order
Work In
Progress
Tender Amount
in Lacks
Remarks
1 Construction Of 276 EWS (Low-Rise) Houses at T.P.-26 (singanpore),F.P. No. 129, Under Chief -Minister (GRUH) Housing Scheme. 276 Shanti Structure Pvt. Ltd, Rajkot 27/01/2014 WIP 1537.99  
2 Construction Of 300 EWS (High-Rise) Houses at T.P.-9 (Palanpore-Bhesan),F.P. No. 164, Under Chief -Minister (GRUH) Housing Scheme. 300 Skyway Infraproject, Mumbai 23/12/2013 WIP 1967.19  
3 Construction Of 272 LIG (High-Rise) Houses at T.P.-28 (Althan- Bhatar),F.P. No. 152, Under Chief -Minister (GRUH) Housing Scheme. 272 M/s. Tirupati Constuction, Surat 23/12/2013 WIP 1616.39  
4 Construction Of 128 EWS (High-Rise) Houses at T.P.-41 (Dindoli),F.P. No. R/8/2, Under Chief -Minister (GRUH) Housing Scheme. 128 S.M. Sheladiya 12/02/2014 WIP 816.61  
5 Construction Of 320 EWS (High-Rise) Houses at T.P.-69 (Godadara-Dindoli),F.P. No. 183(R/9),(Package-I) Under Chief -Minister (GRUH) Housing Scheme. 320 M/s R.N.Dobaria 22/02/2014 WIP 1996.25  
6 Construction Of 256 EWS (High-Rise) Houses at T.P.-69 (Godadara-Dindoli),F.P. No. 183(R/9),(Package-II) Under Chief -Minister (GRUH) Housing Scheme. 256 M/s R.N.Dobaria 22/02/2014 WIP 1625.53  
7 Construction Of 192 EWS (High-Rise) Houses at T.P.-22 (Bhestan),F.P. No. 62, Under Chief -Minister (GRUH) Housing Scheme. 192 Tirupati Construction 22/02/2014 WIP 1104.59  
8 Construction Of 216 EWS (High-Rise) Houses at T.P.-48 (Bhestan),F.P. No. 69,(Package-I), Under Chief -Minister (GRUH) Housing Scheme. 216 Tirupati Construction 30/05/2014 WIP 1297.91  
9 Construction Of 336 EWS (High-Rise) Houses at T.P.-48 (Bhestan),F.P. No. 69,(Package-II), Under Chief -Minister (GRUH) Housing Scheme. 336 Standard Buildcon 22/02/2014 WIP 1995.27  
Total (EWS) 2296 - - - 13957.73

The layout plans for each EWS plots are prepared looking to the easy circulation need of the habitats. Sufficient open spaces with centrally located C.O.P. are provided in each layout.

Considering local requirements, typical floor plan consisting four dwelling units on each floor has been prepared. The building block is ground plus three-storied R.C.C. framed structure. The outer walls are of 23 cm. thick while internal walls are 10 cm. thick partition walls. The windows are steel windows. Grey mosaic tiles flooring is provided. Water supply, drainage, electricity connection, street light and pucca roads are provided. Each dwelling unit has been provided with following facilities.

Description Detail
Living Room 2.60 M x 2.75 M
Kitchen 2.00 M x 1.80 M
W.C. 0.98 M x 0.90 M
Chokdi 0.90 M x 0.90 M
Balcony 1.05 M Wide
Total Built-up area 22.45 Sq. mt.

All the infrastructure facilities like water supply, drainage, roads, streetlight, compound wall etc. are provided by SMC. The land cost and infrastructure cost is subsidized by SMC.


Front Elevation
Front Elevation
Typical Ground Floor Plan
Typical Ground Floor Plan
Typical Floor Plan
Typical Floor Plan

The EWS dwelling units on the basis of a draw are allotted to those who satisfy the following criteria:

  1. The person should be living in Surat since last Five years.
  2. The Family Income of the applicant should not more than Rs. 2500/- per month.
  3. Now onwards as per Governer's letter new income ceiling from 2006-07 for family of applicant should not be more than Rs 3300 per month.