Bridge across creek near Palia Ground-1(Bharimata)

1. | Location | Road from Surat to Dabholi |
2. | River/Nala/Creek | Local creek |
3. | Lane | Two lane |
4. | Year of construction | 1990-1992 |
5. | Cost | Rs.15.75 Lacs |
6. | Details of Bridge | |
Length of Bridge | 19.60 mtr. (skew bridge) | |
(ii) Number of span | One | |
(iii) Span Length | 19.6 mtr. | |
(iv) Carriage Way | 7.5 mtr. + 1.75 mtr. wide footpath on both side. | |
(v) Length of Returns | Left side - 2.018 mtr. Right side - 3.63 mtr. | |
7. | (i)Design Discharge | 85 Cumecs |
(ii) Design H.F.L. | R.L.5.5 mtr. | |
(iii) Type of bridge | Submersible bridge. | |
(iv) F.R.L. | (+) 0.5 mtr. | |
8. | Structural Details : | |
(i) Foundation. | Open foundations | |
(ii) Substructure | R.C.C. wall type substructure. | |
(iii) Superstructure | Pre-stressed solid slab type submersible decking in M-400 concrete. | |
(iv) General Items | Post and Pipe type Railing. | |
9. | Name of Contractor | M/s. Shreenath Construction Co., Surat. |
10. | Name of Consultant | Multi Media Consulting Engineers, Ahmedabad. |