Bridge across creek near Palia Ground-1(Bharimata)

| 1. | Location | Road from Surat to Dabholi |
| 2. | River/Nala/Creek | Local creek |
| 3. | Lane | Two lane |
| 4. | Year of construction | 1990-1992 |
| 5. | Cost | Rs.15.75 Lacs |
| 6. | Details of Bridge | |
| Length of Bridge | 19.60 mtr. (skew bridge) | |
| (ii) Number of span | One | |
| (iii) Span Length | 19.6 mtr. | |
| (iv) Carriage Way | 7.5 mtr. + 1.75 mtr. wide footpath on both side. | |
| (v) Length of Returns | Left side - 2.018 mtr. Right side - 3.63 mtr. | |
| 7. | (i)Design Discharge | 85 Cumecs |
| (ii) Design H.F.L. | R.L.5.5 mtr. | |
| (iii) Type of bridge | Submersible bridge. | |
| (iv) F.R.L. | (+) 0.5 mtr. | |
| 8. | Structural Details : | |
| (i) Foundation. | Open foundations | |
| (ii) Substructure | R.C.C. wall type substructure. | |
| (iii) Superstructure | Pre-stressed solid slab type submersible decking in M-400 concrete. | |
| (iv) General Items | Post and Pipe type Railing. | |
| 9. | Name of Contractor | M/s. Shreenath Construction Co., Surat. |
| 10. | Name of Consultant | Multi Media Consulting Engineers, Ahmedabad. |