Road Development

Below are the Road Development Project Details:

Sr. No. Name of Work Tender Amount/Estimated Amount(In LACS) Expenditure Till 31/03/2020 (In LACS) Total Expenditure in Tender(In LACS) Work Order Date Probable Date of Completion of Project
1 Package-16 C.C. road  construction from Anuvratdwar to Surat-Dumas road  (canal road) via G.D. Goenka School. 5188.82 2580.51 5169.01 24/10/2017 Completed
2 MICROSURFACING PACKAGE-6 360.09 206.79 288.49 06/11/2018 Completed
3 Construction of capet/recarpet layers by using shredded plastic waste per new design 225.81 315.83 401.58 23/01/2019 Completed
4 MILLING work PHASE -8 103.42 93.87 93.87 25/02/2019 Completed
5 ''Construction of V.I.P. roads as model road from L&T colony, Sachin-Magdalla highway to Vesu Junction (2.0 km) along with  footpath,street light, Street furniture ,traffic signages and landscaping,etc. in South West (Athwa) Zone.'' 1310.00 292.93 1236.27 06/10/2017 Completed
6 Construction of V.I.P. road as model road from Vesu Junction to Shyam Mandir (2.85 km) along with footpath, street light, Street furniture, traffic signages and landscaping, etc. in South West (Athwa) Zone. 1866.00 211.63 1850.57 06/10/2017 Completed
7 Repairing work of road pot holes using jet patching technology by JET PATCHER machine in Surat Municipal Corporation. 166.5 88.75 88.75 26/08/2019 Completed
8 Polymeric/ACC marg technology. (Phase-10) 1545.00 801.80 2014.77 24/10/2017 31/12/2020
9 Package-13 C.C. road from Hazira road (Pal-R.T.O.  junction) to Palanpur gam canal culvert. 2130.09 648.00 1570.20 10/01/2018 31/12/2020
10 Package-15  C.C. road on both side of existing canal from palanpur canal culvert to Bhesan junction. 3786.00 796.80 2052.09 24/10/2017 31/12/2020
11 Package-18 Rigid & flexible pavement on either side of canal, storm water drg. network & allied work from BRTS- Panas -Bread linear circle- Soham circle. 2041.15 891.32 1081.82 15/10/2018 31/12/2020
12 C.C. road from Dindoli flyover to Udhna main road. 999.15 154.20 154.20 25/02/2019 31/12/2020
13 Package 15 (A)  C.C. road on both side of existing canal from Bhesan Junction road to SUDA Limit in WZ. 1344.00 0.00 0.00 25/02/2019 31/12/2020
14 MICROSURFACING Package-7 504.21 292.46 292.46 05/03/2019 31/12/2020
15 MILLING work PHASE -9 109.01 42.00 42.00 14/11/2019 31/12/2020
16 C.C.ROAD: East Zone MOTAVARACHHA VIP circle to RAM Chowk. 2081.19 750.60 750.60 18/06/2019 14/12/2020
17 C.C.ROAD: East Zone RAM chowk to Abrama Check post 2079.78 750.60 750.60 18/06/2019 14/12/2020