1.
|
Location
|
Road from Kamela Darwaja to Limbayat.
|
2.
|
River/Nala/Creek
|
Meethi khadi
|
3.
|
Lane
|
Two lane
|
4.
|
Year of construction
|
1995-1996
|
5.
|
Cost
|
Rs.32.43 Lacs
|
6.
|
Details of Bridge
|
|
|
Length of Bridge
|
36.90 mtr. (skew bridge)
|
|
(ii) Number of span
|
Three
|
|
(iii) Span Length
|
12.3 mtr. c/c
|
|
(iv) Carriage Way
|
7.5 mtr. + 1.5 mtr. wide footpath one side.
|
|
(v) Length of Returns
|
Left side - 5.00 mtr. Right side - 5.00 mtr.
|
7.
|
(i)Design Discharge
|
670 Cumecs
|
|
(ii) Design H.F.L.
|
R.L.9.50 mtr.
|
|
(iii) Type of bridge
|
Submersible bridge.
|
|
(iv) F.R.L.
|
(-) 2.80 mtr. Piers
|
|
|
(+) 0.20 mtr. Abutment
|
8.
|
Structural Details :
|
|
|
(i) Foundation.
|
Open foundations for piers and abutments.
|
|
(ii) Substructure
|
R.C.C. plate type pier substructure in M-200 and RCC counterfort type abutment is
provided.
|
|
(iii) Superstructure
|
R.C.C. solid slab type decking in concrete M-200 and supported over four number
of elasomeric bearings.
|
|
(iv) General Items
|
Post and Pipe Railing.
|
9.
|
Name of Contractor
|
M/s. Harish J. Patel, Surat.
|
10.
|
Name of Consultant
|
Multi Media Consulting Engineers, Ahmedabad.
|