Railway bridge no.452 across river Tapti near Utran

1. | Location | Railway line from Surat to Utran. |
2. | River/Nala/Creek | Tapi river |
3. | Lane | Double Track |
4. | Year of construction | 1915 |
5. | Cost | ---- |
6. | Details of Bridge | |
(i)Length of Bridge between ends of decking | 572.30 Mt. | |
(ii) Number of span | 10 Nos. | |
(iii) Span Length | 57.0 mtr. | |
(iv) Carriage Way | 11.23 mtr. + 1.0 mtr. Footpath on upstream side | |
(v) Length of RCC Returns | Left side - 13.10 mtr. Right side - 4.25 mtr. | |
7. | (i)Design Discharge | Flood of 16 lakh cusecs has passed through the bridge in year 1956. |
(ii) Design H.F.L. | Not available | |
(iii) Type of bridge | High level | |
(iv) F.R.L. | Not available | |
8. | Structural Details : | |
(i) Foundation. | Double well cement concrete | |
(ii) Substructure | Stone Masonary Piers | |
(iii) Superstructure | Structural steel open web girder super structure is resting on pedestals on pier. | |
(iv) General Items | Post and Pipe Railing. | |
9. | Name of Contractor | Not available |
10. | Name of Consultant | Not available. |