Railway bridge no.452 across river Tapti near Utran

1. Location Railway line from Surat to Utran.
2. River/Nala/Creek Tapi river
3. Lane Double Track
4. Year of construction 1915
5. Cost ----
6. Details of Bridge
  (i)Length of Bridge between ends of decking 572.30 Mt.
  (ii) Number of span 10 Nos.
  (iii) Span Length 57.0 mtr.
  (iv) Carriage Way 11.23 mtr. + 1.0 mtr. Footpath on upstream side
  (v) Length of RCC Returns Left side - 13.10 mtr. Right side - 4.25 mtr. 
7. (i)Design Discharge Flood of 16 lakh cusecs has passed through the bridge in year 1956.
  (ii) Design H.F.L. Not available
  (iii) Type of bridge High level
  (iv) F.R.L. Not available
8. Structural Details :  
  (i) Foundation. Double well cement concrete
  (ii) Substructure Stone Masonary Piers
  (iii) Superstructure Structural steel open web girder super structure is resting on pedestals on pier.
  (iv) General Items Post and Pipe Railing.
9. Name of Contractor Not available
10.  Name of Consultant Not available.