| 1.
|
Location
|
Road from opp. Kinnary cinema to Udhna Industrial Estate.
|
| 2.
|
River/Nala/Creek
|
Local khadi
|
| 3.
|
Lane
|
Four
|
| 4.
|
Year of construction
|
1990/1993
|
| 5.
|
Cost
|
Rs.81.74 Lacs
|
| 6.
|
Details of Bridge
|
|
|
(i) Length of Bridge between ends of decking
|
60 mtr. (Skew)
|
|
(ii) Number of span
|
Three
|
|
(iii) Span Length
|
20 mtr.
|
|
(iv) Carriage Way
|
2 x 7.5 mtr. + 1.579 mtr. Wide footpath on both sides (two separate bridges)
|
|
(v) Length of Returns
|
Left side - 8.93 mtr.
|
|
|
|
Right side -8.93 mtr.
|
| 7.
|
(i)Design Discharge
|
400.00 Cumecs
|
|
(ii) Design H.F.L.
|
R.L. 8.00 mtr.
|
|
(iii) Type of bridge
|
High Level bridge
|
|
(iv) F.R.L.
|
R.L.(-) 14.0 mtr Piers
|
|
|
|
R.L.(-) 11.0 mtr. Abutments
|
| 8.
|
Structural Details :
|
|
|
(i) Foundation.
|
Bored cast in situ piles 1200 mm dia., 4 Nos. under piers and 12 Nos. under abutments.
|
|
(ii) Substructure
|
R.C.C. M-200, 900 mm thick plate piers and wall type abutments.
|
|
(iii) Superstructure
|
Pre-stressed concrete in M-350 T beam/ slab three girder system deck simply
supported slab.
|
|
(iv) General Items
|
R.C.C. M-200 parapets.
|
| 9.
|
Name of Contractor
|
M/s. Sona Builders, Surat.
|
| 10.
|
Name of Consultant
|
Multi Media Consulting Engineers, Ahmedabad.
|