Construction of " Shri Maharshi Arvind Ghosh " Fly Over Bridge in East zone 24.00 mt wide T.P.Road near Archna Vidhyalay from Bombay market to Punagam Road in Varachcha, Surat.

01 | Location | : | East zone,bombay market to puna gam road near, archna school. |
02 | River/ Nala/ Creek | : | F.O.B. |
03 | Lane | : | Two lane undivided |
04 | Year of Construction | : | May 2015 |
05 | Cost | : | Rs. 16,12,82,724=00 |
06 | Details of Bridge | : | |
07 | (i) Length of Bridge
(Between ends of Decking) |
: | Total = 479.80 mt. Main Portion = 330.00 mt. Approch portion= 149.80 mt. |
(ii) Number of Span | : | 15 | |
(iii) Span Length | : | 12.50 mt.= 4
25.00 mt.= 9 32.00 mt.= 1 38.00 mt.= 2 |
|
(iv) Carriage Way | : | 10.600 mt. | |
(v) Length of R.C.C.
Approaches &Returns |
: | (1) Towards Puna Village : 48.24 mt.
(2) Towards Bombay Market : 83.77 mt. Total : 132.01 mt. |
|
07 | (i) Design Discharge | : | ------ |
(ii) Design H.F.L. | : | ------ | |
(iii) Type of Bridge | : | ------ | |
(iv) Finished Road Top Level | : | ------ | |
08 | Structural Details | ||
(i) Foundation | : | 1000 m.m. dia Pile , 600 m.m.dia piles, 1200 mm dia piles |
|
(ii) Substructure | : | R.C.C. pier, piercap, Abutment | |
(iii) Superstructure | : | P.S.C. SOLID SLAB, P.S.C.I GIRDER , Voided Slab. | |
(iv) General Items | : | R.C.C. Wearing coat | |
09 | Name of Contractor | : | Rachana Construction, Ankleshwar |
10 | Name of Design Consultant | : | (Pankaj Patel & Associates, Ahmadabad )
Pankaj M Patel Consultant Pvt Ltd., Ahmadabad |
11 | Name of Project Management Consultancy | : | Mahimtura Consultant Pvt Ltd., Mumbai |