Construction of creek brigde on variav Khadi in Place of Existing Old bridge at Village Variav in Surat City.

01 Location : Joining of Koliwad & Makhaniya Tekra, Variav Village, Surat.
02 River/ Nala/ Creek/ Lake : Creek
03 Lane : Two
04 Year of Construction : January- 2015
05 Cost : Rs.2,72,48,280=32 Paise
06 Details of Bridge :

 

07 (i) Length of Bridge      
   (Between ends of Decking)
: 40.00 mt
  (ii) Number of Span : 2(Two)
  (iii) Span Length : 20.00 mt
  (iv) Carriage Way : 7.50 mt
  (V) Width of Bridge : 10.00 mt(Main Bridge) & 9.00 mt(Approach)
  (v) Length of R.C.C.
     Approaches &Returns
: 22.855 mt on Makhniya Tekra Side & 10.00 mt on Koliwad Side.
07 (i)   Design Discharge : ---
  (ii)  Design H.F.L. : 22.00
  (iii) Type of Bridge : Submersible.
  (iv) F.R.L. : 20.00 mt
08 Structural Details    
  (i) Foundation : 1000 mm dia pile foundation
  (ii) Substructure : R.C.C.  pier/ pier cap,Abutment.
  (iii) Superstructure : PSC Solid Slab
  (iv) General Items : Strip seal Expansion Joint, Elastomeric bearing.
09 Name of Contractor : Radhe Associate, Mehsana
10 Name of Design Consultant : (Pankaj Patel & Associates, Ahmadabad )
Pankaj M Patel Consultant Pvt Ltd., Ahmadabad
11 Name of Project Management Consultant :

----

12 Name of Third Party Inspection (T.P.I.) : Indian Register of Shipping Mumbai