1.
|
Location
|
Road from Surat to Rander
|
2.
|
River/Nala/Creek
|
Tapi River
|
3.
|
Lane
|
Two
|
4.
|
Year of construction
|
1877
|
5.
|
Cost
|
Rs.8.13 Lacs
|
6.
|
Details of Bridge
|
|
(i) Length of Bridge between ends of decking
|
551,14 mtr.
|
|
(ii) Number of span
|
17 Nos.(one span on Right side has been dismantled)
|
|
(iii) Span Length
|
32,42 mtr.
|
|
(iv) Carriage Way
|
6 mtr.+1.5 mtr. Wide footpath on both sides(Now removed).
|
|
(v) Length of Returns
|
Left side - Not available
|
|
|
Right side - Not available
|
7.
|
(i)Design Discharge
|
Floor of 16 lakh causecs has passed through the bridge in year 1956.
|
|
(ii) Design H.F.L.
|
11.0 mt.
|
|
(iii) Type of bridge
|
High level
|
|
(iv) F.R.L.
|
Not available
|
8.
|
Structural Details
|
|
(i) Foundation
|
Cast Iron cylindrical piles (2 Nos.)having 1.52 mt. steel internal dia and 1"
thickness of shell with embedment of 7.67 mt. to 18.90 mt. in hard clay strata.
|
|
(ii) Substructure
|
C.I.piles braced by structural steel members. The superstructure is directly resting
on piles.
|
|
(iii) Superstructure
|
Steel trusses 2 Nos. with concrete decking.
|
|
(iv) General Items
|
Steel Hand Rails (now removed). The bridge is not being used for vehicular traffic.
|
9.
|
Name of Contractor
|
Not available
|
10.
|
Name of Consultant
|
Not available
|