| 1.
|
Location
|
Road from Ring Road to Adajan
|
| 2.
|
River/Nala/Creek
|
Tapi River
|
| 3.
|
Lane
|
Four
|
| 4.
|
Year of construction
|
1985/1991
|
| 5.
|
Cost
|
Rs.1365.40 Lacs
|
| 6.
|
Details of Bridge
|
|
|
(i) Length of Bridge between ends of decking
|
700.00 mtr.
|
|
|
(ii) Number of span
|
14 Nos.
|
|
|
(iii) Span Length
|
50.00 mtr.
|
|
|
(iv) Carriage Way
|
2 x 7.5 mtr.+ 3.15 mtr. wide footpath on both side.
|
|
|
(v) Length of Returns
|
Left side - 217 mtr.
|
|
|
|
Right side - 232 mtr.
|
| 7.
|
(i)Design Discharge
|
34000 Cumecs
|
|
|
(ii) Design H.F.L.
|
R.L. 11.40 mtr.
|
|
|
(iii) Type of bridge
|
High level bridge
|
|
|
(iv) F.R.L.
|
R.L. (-) 43.06 mtr. (pier)
|
| |
|
R.L. (-) 28.00 mtr. (pier) |
| 8.
|
Structural Details
|
|
|
(i) Foundation
|
Single circular c.c. well foundation with nominal reinforcement 7.5mt dia., 45.46 mt. deep below well cap.
|
|
|
(ii) Substructure
|
R.C.C. per with R.C.C. pier cap
|
|
|
(iii) Superstructure
|
Pre-stressed concrete 6 girder system simply supported over bearings and R.C.C. slab
|
|
|
(iv) General Items
|
R.C.C. precast railing
|
| 9.
|
Name of Contractor
|
Gujarat State Construction Corporation Ltd.
|
| 10.
|
Name of Consultant
|
Stup Consultant, Mumbai.
|