Sardar Patel Bridge across river Tapti

1. Location Road from Ring Road to Adajan
2. River/Nala/Creek Tapi River
3. Lane Four
4. Year of construction 1985/1991
5. Cost Rs.1365.40 Lacs
6. Details of Bridge
  (i) Length of Bridge between ends of decking 700.00 mtr.
  (ii) Number of span 14 Nos.
  (iii) Span Length 50.00 mtr.
  (iv) Carriage Way 2 x 7.5 mtr.+ 3.15 mtr. wide footpath on both side.
  (v) Length of Returns Left side - 217 mtr.
    Right side - 232 mtr.
7. (i)Design Discharge 34000 Cumecs
  (ii) Design H.F.L. R.L. 11.40 mtr.
  (iii) Type of bridge High level bridge
  (iv) F.R.L. R.L. (-) 43.06 mtr. (pier)
    R.L. (-) 28.00 mtr. (pier)
8. Structural Details
  (i) Foundation Single circular c.c. well foundation with nominal reinforcement 7.5mt dia., 45.46 mt. deep below well cap.
  (ii) Substructure R.C.C. per with R.C.C. pier cap
  (iii) Superstructure Pre-stressed concrete 6 girder system simply supported over bearings and R.C.C. slab
  (iv) General Items R.C.C. precast railing
9. Name of Contractor Gujarat State Construction Corporation Ltd.
10.  Name of Consultant Stup Consultant, Mumbai.