Sardar Patel Bridge across river Tapti

| 1. | Location | Road from Ring Road to Adajan |
| 2. | River/Nala/Creek | Tapi River |
| 3. | Lane | Four |
| 4. | Year of construction | 1985/1991 |
| 5. | Cost | Rs.1365.40 Lacs |
| 6. | Details of Bridge | |
| (i) Length of Bridge between ends of decking | 700.00 mtr. | |
| (ii) Number of span | 14 Nos. | |
| (iii) Span Length | 50.00 mtr. | |
| (iv) Carriage Way | 2 x 7.5 mtr.+ 3.15 mtr. wide footpath on both side. | |
| (v) Length of Returns | Left side - 217 mtr. | |
| Right side - 232 mtr. | ||
| 7. | (i)Design Discharge | 34000 Cumecs |
| (ii) Design H.F.L. | R.L. 11.40 mtr. | |
| (iii) Type of bridge | High level bridge | |
| (iv) F.R.L. | R.L. (-) 43.06 mtr. (pier) | |
| R.L. (-) 28.00 mtr. (pier) | ||
| 8. | Structural Details | |
| (i) Foundation | Single circular c.c. well foundation with nominal reinforcement 7.5mt dia., 45.46 mt. deep below well cap. | |
| (ii) Substructure | R.C.C. per with R.C.C. pier cap | |
| (iii) Superstructure | Pre-stressed concrete 6 girder system simply supported over bearings and R.C.C. slab | |
| (iv) General Items | R.C.C. precast railing | |
| 9. | Name of Contractor | Gujarat State Construction Corporation Ltd. |
| 10. | Name of Consultant | Stup Consultant, Mumbai. |