Bridge across river Tapi joining Nana Varachha and Mota Varachha (Savjibhai Korat Bridge), Surat

| 1. | Location | : | Road from Nana Varachha on left bank to Mota Varachha on right bank. |
| 2. | River/ Nala/ Creek | : | Tapi river |
| 3. | Lane | : | Four |
| 4. | Year of Construction | : | May - 2001 |
| 5. | Cost | : | Rs. 1947.35 Lacs |
| 6. | Details of Bridge | : |
|
| 7. |
(i) Length of Bridge
(Between ends of Decking) |
: | 544.6 mt. |
| (ii) Number of Span | : | 13 nos. | |
| (iii) Span Length | : | 11 spans of 42 mt. each & 2 spans of 41.3 mt. each at ends. | |
| (iv) Carriage Way | : | 4 lane and 1.8 mt. wide footpath on both sides and central verge of 1.8 mt. | |
|
(v) Length of R.C.C.
Approaches &Returns |
: | Left side - 15.0 mt., Right side - 152.0 mt. beyond in gradient | |
| 8. | (i) Design Discharge | : | 34000 cumecs |
| (ii) Design H.F.L. | : | R.L. + 15.0 mt. | |
| (iii) Type of Bridge | : | High level Bridge | |
| (iv) Finished Road top level | : | 19.66 mt. | |
| 9. | Structural Details |
|
|
| (i) Foundation | : | For piles -30.8 mt. long, 10 piles of 1.5 mt. dia. in c.c.M-300 | |
| (ii) Substructure | : | Wall type R.C.C. piers | |
| (iii) Superstructure | : | Pre-stressed concrete 6 girder systems with R.C.C. slab simply supported over bearings. | |
| (iv) General Items | : | R.C.C. M-200 parapet. | |
| 10. | Name of Contractor | : | Vijay M. Mistry Construction Pvt. Ltd., Ahmedabad |
| 11. | Name of Design Consultant | : | Multi Media Consulting Engineers, Ahmedabad. |
| 12. | Name of Project Management Consultant | : | Lea Associates South Asia Pvt. Ltd., New Delhi. |