1.
|
Location
|
Road from Makai pool on left bank to Adajan on right bank.
|
2.
|
River/Nala/Creek
|
Tapi River
|
3.
|
Lane
|
Four
|
4.
|
Year of construction
|
1990/1996
|
5.
|
Cost
|
Rs.1551.28 Lacs
|
6.
|
Details of Bridge
|
|
(i) Length of Bridge between ends of decking
|
625.00 mtr.
|
|
(ii) Number of span
|
25 Nos.
|
|
(iii) Span Length
|
25 mtr.
|
|
(iv) Carriage Way
|
2x7.5 mtr. + 1.5 mtr. Wide footpath on one side each on two separate bridges.
|
|
(v) Length of Returns
|
Left side -
|
|
|
Right side - 34.40 mtr.
|
7.
|
(i)Design Discharge
|
34000 Cumecs
|
|
(ii) Design H.F.L.
|
R.L. 13.90 mtr.
|
|
(iii) Type of bridge
|
Submersible bridge
|
|
(iv) F.R.L.
|
R.L. (-) 30.00 mtr (pier)
|
|
|
R.L. (-) 21.00 mtr (Abutment)
|
8.
|
Structural Details
|
|
(i) Foundation
|
R.C.C.bored cast in situ pile foundation 1.5 mtr. Dia. Under piers and abutments.
|
|
(ii) Substructure
|
R.C.C.single circular column substructure.
|
|
(iii) Superstructure
|
Trunckeed pre-stressed solid slab, simply on ealstomeic bearings and anchored in pier cap.
|
|
(iv) General Items
|
R.C.C. type railings.
|
9.
|
Name of Contractor
|
Not available
|
10.
|
Name of Contractor
|
Vijay M. Mistry Construction Pvt.L:td., Ahmedabad.
|
11. |
Name of Consultant |
Multi Media Consulting Engineers, Ahmedabad. |