Construction of " Dr.Shyana Prasad Mukharji " four lane bridge across river Tapi joining Dabholi Village to Jahangirpura (Nr.Intake well) in Surat City. (Under JnNURM)

1. | Location | Near Intake well on Jahangirpura side and other end on Dabholi side near Torrent Power electric sub station. | |
2. | Total Length of Bridge | ||
1.River span | 31 * 34.70 = 1075.70 mt. | ||
2. Jahangirpura end | |||
Towards City | |||
- Via Duct |
2 * 26.708 +1 *26.646 + 4 * 25 + 1* 25.50
= 205.562 mt. |
||
- Solid Approach | 168.803 mt. | ||
Total: | = 374.365 mt. | ||
Towards Jakatnaka - | |||
- Via Duct |
1 * 25.50 + 2 * 25 + 1 * 25.006 + 1* 31.093
+ 1 * 30.980+ 1 * 30.949 = 193.528 mt. |
||
- Solid Approach | = 179.064 mt. | ||
Total: | = 372.592 mt. | ||
3. Towards Dabholi - Side | |||
- Via Duct | 1 * 12.00 + 1 * 25.00 = 37.00 mt. | ||
- Solid Approach | = 113.520 mt. | ||
Total: | = 150.520 mt. | ||
Total Length | 1600.585(4 lane)+372.592(2 lane) | = 1973.177 mt. | |
Total Area of Bridge | 36,867.404 Sq.Mt. | ||
3. | Type of Foundation | ||
River span | 1500 mm dia. Pile Foundation | ||
- Via Duct | Open Excavation | ||
4. | Sub Structure | R.C.C. Solid Pier | |
5. | Super Structure | ||
River span | Cast in Situ Prestressed Box Girder | ||
Via Duct | RCC Box Structure | ||
6. | Carriage Way | ||
Main Bridge | Two Lane up & Two Lane down (21.70mt.) | ||
Towards Jakatnaka Up Ramp | Two Lane up 8.40mt | ||
Towards City Up & Dn Ramp | Four Lane 17.0 mt. | ||
(i) Design Discharge | 12 lacs cusecs and checked for submersible bridge for 16 lacs cusecs | ||
(ii) Design H.F.L. | R.L. 15.75 mt. | ||
(iii) Type of Bridge | High level Bridge | ||
(iv) Finished Road top level | 20.666 mt. | ||
7. | Bearing | POT-PTFE & Neoprene Bearing | |
8. | Expansion Joint | Strip Seal Type | |
9. | Project Cost | 6933.08 Lacs including Cement & Steel | |
10 | Funding under JnNURM Scheme | ||
Sanctioned project cost | : Rs. 6500 Lacs | ||
Share of GoI (50%) | : Rs. 3250 Lacs | ||
Share of GoG (20%) | : Rs. 1300 Lacs | ||
Share of SMC (30%) | :Rs. 1950 Lacs | ||
10. | Time Limit of Work | 30 months including monsoon | |
11. | Name of Contractor | M/s. Ranjit Construction Co., Ahmedabad | |
12. | Name of Design Consultant | Stup Consultant, Navi Mumbai | |
13. | Name of Third Party Inspecting agency |
Certifications Engineers International Ltd.,
New Delhi. |
|
14. | Name of Proof Check Consultant | Sardar Vallabhbhai National Institute of Technology, Surat. |