Construction of the Fly Over Bridge at Gujarat Gas Circle junction on Surat Hazira main Road, Surat ( Under SJMMSVY )

| 1. | Location | : | Adjoining to Sardar bridge near Gujarat Gas circle, Bulka bhavan school junction on Surat-Hazira road and On Anand Mahel road. |
| 2. | River/ Nala/ Creek | : | Fly Over Bridge |
| 3. | Lane | : | Two |
| 4. | Year of Construction | : |
Up Ramp : May-2012 Down Ramp : Sept.- 2012 |
| 5. | Project Cost | : | Rs. 3839.22 Lacs |
| 6. | Details of Bridge | : | 2 up + 2 down lane seperate |
|
(i) Length of Bridge
(Between ends of Decking) |
: | 1338.08 mt. (661.50 mt. Sardar br. to Anand Mahal rd. + 462.70 mt. Adajan pump to Sardar br + 220.00 mt. opp. Bhulkabhavan school.) | |
| (ii) Total width of Bridge | : | 8.50 mt. | |
| (iii) Number of Span | : | 36 nos. | |
| (iv) Span Length | : | Max. 33 mt , min 24 mt | |
| (vi) Carriage Way | : | 7.50 mt. | |
|
(vii) Length of R.C.C.
Approaches &Returns |
: |
(i) 60.00 mt.
(ii) 98.00 mt. (iii) 102.00 mt. |
|
| 7. | (i) Design Discharge | : | N.A. |
| (ii) Design H.F.L. | : | N.A. | |
| (iii) Type of Bridge | : | Fly Over Bridge | |
| (iv) Finished Road Level | : | Varies | |
| 8. | Structural Details | ||
| (i) Foundation | : | Pile Foundation | |
| (ii) Substructure | : | Pier | |
| (iii) Superstructure | : | PSC Voided slab | |
| (iv) General Items | : | RCC Retaining wall in approaches | |
| 9. | Name of Contractor | : | Rajkamal Builders Infrastructure Pvt. Ltd., Ahmedabad |
| 10. | Name of Design Consultant | : | Consulting Engineers Services (India) Ltd., Navi Mumbai |
| 11. | Name of Project Management Consultant | : | S. N. Bhobe & Associates Pvt. Ltd., Navi Mumbai. |
| 12. | Name Proof Check Consultant | : | Sardar Vallabhbhai National Institute of Technology (SVNIT) |