Construction of " Shri Maharana Pratap " Railway Over bridge in lieu of L. C. no. 3-C on Surat - Bhusaval main line & Bhestan - Bhusaval loop line joining Godadara & Dindoli on 45 mt. wide T.P./D.P. road, Surat.

01 | Location | : |
In lieu of L. C. no. 3-C joining Godadara & Dindoli
on 45 mt. wide middle ring road |
02 | River/ Nala/ Creek | : | Railway Over Bridge |
03 | Lane | : | Three Lane (Up) & Three Lane (Dn) |
04 | Year of Construction | : | Under Construction |
05 | Cost | : | Rs. 43,67,99,824=75 Ps. |
06 | Details of Bridge | : | |
07 |
(i) Length of Bridge
(Between ends of Decking) |
: |
In SMC area : 429.47 mt. avg. In Rly. area : 104.44 mt. avg. Total : 533.91 mt. avg. |
(ii) Number of Span | : | 21 | |
(iii) Span Length | : | Span length Varying from 17.50 mt. to 36.38 mt. | |
(iv) Carriage Way | : | 2 x 10.50 mt. (3 lane Up & 3 lane Dn) | |
(V) Width of Bridge | : |
In SMC area : 22.80 mt.
In Rly. area : 24.93 mt. |
|
(vi) Length of R.C.C.
Approaches &Returns |
: |
Godadara Side : 130 mt. Dindoli Side : 133.75 mt. |
|
07 | (i) Design Discharge | : | N.A. |
(ii) Design H.F.L. | : | N.A. | |
(iii) Type of Bridge | : | Railway Over Bridge | |
(iv) F.R.L. | : | 24.645 mt. | |
08 | Structural Details | ||
(i) Foundation | : | 1000 mm dia Pile Foundation with Pile Cap | |
(ii) Substructure | : | RCC Pier and Pier Cap | |
(iii) Superstructure | : |
Railway limit : Steel "I" girder & Deck slab SMC limit : Pre-cost P.S.C."I" Girders & Deck slab / Box girder |
|
(iv) General Items | : | RCC Anti crash Barrier, R.E. wall in approaches | |
09 | Name of Contractor | : | Vijay M. Mistry Construction Pvt.Ltd., Ahmedabad |
10 | Name of Design Consultant | : | Shri Jignesh B.Gandhi, Casad Consultant, Ahmedabad. |
11 | Name of Project Management Consultancy | : | Design Circle R & B, Gandhinagar. |
12 | Name of Third Party Inspection | : | RITES Ltd., Mumbai |
13 | Name of Proof Checking Consultancy | : | SVNIT, Surat |