Construction of " Shri Prithviraj Chauhan " Fly Over Bridge at Evershine Circle, Bhatar road char rasta, Surat. (UNDER SJMMSVY)

| 01 | Location | : | Evershine Circle Junction, Bhatar Char Rasta |
| 02 | River/ Nala/ Creek | : | Fly Over Bridge |
| 03 | Lane | : | Three Lane Up &Three Lane Down |
| 04 | Year of Construction | : | June-2013 |
| 05 | Cost | : | Rs. 24,07,89,028=09 |
| 06 | Details of Bridge | : | |
|
(i) Length of Bridge
(Between ends of Decking) |
: | 271.90mt. (Total 449.025mt incl. approach) | |
| (ii) Number of Span | : | 2 X 14 = 28 | |
| (iii) Span Length | : |
10.00 X 1 X 2 = 20mt. 12.50 X 5 X 2 = 125mt. 21.70 X 2 X 2 = 86.80mt. 25.00 X 4X 4 = 200 mt. 28.00 X 2 X2 = 112 mt For both Up & Down (Three Lane Up & Three lane Down) |
|
| (iv) Carriage Way | : |
2 X 10.50mt. both Up & Down Total width 23.20mt. |
|
|
(v) Length of R.C.C.
Approaches &Returns |
: |
Towards Uhana =87.123 mt. Towards Magadalla =90.002 mt. |
|
| 07 | (i) Design Discharge | : | N. A. |
| (ii) Design H.F.L. | : | N. A. | |
| (iii) Type of Bridge | : | Fly Over Bridge | |
| (iv) Finished Road Top Level | : | 16.062 mt. | |
| 08 | Structural Details | ||
| (i) Foundation | : | RCC Bored Cast in situ 1000mm dia 164 Nos. of pile, Pile Foundation | |
| (ii) Substructure | : | Rectangular Pier | |
| (iii) Superstructure | : | PSC / RCC Solid Slab | |
| (iv) General Items | : |
(1) Strip seal Expansion joint (2) Elastomeric Bearing |
|
| 09 | Name of Contractor | : | Ranjit Buildcon Ltd, Ahmedabad. |
| 10 | Name of Design Consultant | : |
(Formally Pankaj Patel & Associates, Ahmedabad.)
Pankaj M.Patel Consultants Pvt Ltd., Ahmedabad |
| 11 | PMC | : |
(Formally Pankaj Patel & Associates, Ahmedabad.)
Pankaj M.Patel Consultants Pvt Ltd., Ahmedabad |