Construction of " Shri Sant Tukaram " Railway Over Bridge at L.C. No.143, Near Bhestan Railay Station.

01 Location : ROB in lieu of lc no 143 at rly km 257/23-26 on Surat-Mumbai B.G. Railway line between station Udhana and Sachin at Surat
02 River/ Nala/ Creek : Railway Over Bridge
03 Lane : Three Lane
04 Year of Construction : Under Progress
05 Cost : Amount � 38,00,36,152=79 paisa
06 Details of Bridge :  
07 (i) Length of Bridge
(Between ends of Decking)
: In SMC area - 911.60 mt.
(including both and approaches) In Rly area - 68.40 mt.
Total   - 980.00 mt.
  (ii) Number of Span : 28
  (iii) Span Length : 25.00 X 11=275 mt.
23.250 X 3=69.75 mt.
23.200 X 10=232.00 mt.
21.150 X 1 =21.150 mt.
16.500 X 2 =33.000 mt.
37.200X 1= 37.200 mt.
31.200X 1= 31.200 mt.
8.121X 17= 138.057 mt.
  (iv) Width of Bridge : In SMC area - 11.90mt.
In Rly area - 15.50/15.80mt.
  (v) Length of R.C.C.
Approaches &Returns
: Towards Sania Kande village=142.65
08 (i) Design Discharge : --------
  (ii)  Design H.F.L. : --------
  (iii) Type of Bridge : Rly Over Bridge
  (iv) F.R.L. : 23.010mt.
09 Structural Details    
  (i) Foundation : Pile Foundation
  (ii) Substructure : R.C.C. Circular Pier & Pier Cap
  (iii) Superstructure : Steel ' I ' Girder, Pre cast PSC ' I ' Girder & Deck slab.
  (iv) General Items : (1) Strip seal Expansion joint
(2) Elastomeric Bearing
(3) POT PTFE Bearing
10 Name of Contractor : Ranjit Buildcon Ltd,Ahmedabad
11 Name of Design Consultant : Multimedia Consultants Pvt. Ltd., Ahmedabad.
12 Name of Proof Check Consultant : SVNIT,Surat
13 Name of Project Management Consultant : Maimtura Consultants Pvt Ltd., Mumbai