Construction Of Bridge across creek on 45.00 Mt Wide T.P. Road, T.P. Scheme No.72 (Bamroli) in south zone, Surat.

01 Location : T.P.Scheme No.72(Bamroli), South Zone, Surat.
02 River/ Nala/ Creek/ Lake : Creek
03 Lane : Three Lane up & Three lane Down
04 Year of Construction : April - 2015
05 Cost : Rs.7,59,46,755=74 Paise
06 Details of Bridge :  
07 (i) Length of Bridge      
   (Between ends of Decking)
: 41.564 mt(Skew Length)
  (ii) Number of Span : 02 (Two)
  (iii) Span Length : 20.657 mt
  (iv) Carriage Way : 10.500 mt x 2
  (V) Width of Bridge : 29.70 mt
  (v) Length of R.C.C.
     Approaches &Returns
: 68.82 mt - Bhimrad Side
71.15 mt.- Bamroli Side 
07 (i)   Design Discharge : ---
  (ii)  Design H.F.L. : ---
  (iii) Type of Bridge : Submersible Bridge
  (iv) F.R.L. : 6.500 mt
08 Structural Details    
  (i) Foundation : 1000 mm dia pile foundation
  (ii) Substructure : Pier, Piercap &  Abutment
  (iii) Superstructure : PSC Solid Slab(M-40 grade concrete)
  (iv) General Items : Strip seal Expansion Joint, Elastomeric bearing.
09 Name of Contractor : Ajay Protech Pvt. Ltd.
10 Name of Design Consultant : (Pankaj Patel & Associates, Ahmadabad )
Pankaj M Patel Consultant Pvt Ltd., Ahmadabad
11 Name of Project Management Consultant :

----

12 Name of Third Party Inspection (T.P.I.) : Indian Register of Shipping,  Mumbai