Construction Of Bridge across creek on 45.00 Mt Wide T.P. Road, T.P. Scheme No.72 (Bamroli) in south zone, Surat.

01 | Location | : | T.P.Scheme No.72(Bamroli), South Zone, Surat. |
02 | River/ Nala/ Creek/ Lake | : | Creek |
03 | Lane | : | Three Lane up & Three lane Down |
04 | Year of Construction | : | April - 2015 |
05 | Cost | : | Rs.7,59,46,755=74 Paise |
06 | Details of Bridge | : | |
07 | (i) Length of Bridge
(Between ends of Decking) |
: | 41.564 mt(Skew Length) |
(ii) Number of Span | : | 02 (Two) | |
(iii) Span Length | : | 20.657 mt | |
(iv) Carriage Way | : | 10.500 mt x 2 | |
(V) Width of Bridge | : | 29.70 mt | |
(v) Length of R.C.C.
Approaches &Returns |
: | 68.82 mt - Bhimrad Side 71.15 mt.- Bamroli Side |
|
07 | (i) Design Discharge | : | --- |
(ii) Design H.F.L. | : | --- | |
(iii) Type of Bridge | : | Submersible Bridge | |
(iv) F.R.L. | : | 6.500 mt | |
08 | Structural Details | ||
(i) Foundation | : | 1000 mm dia pile foundation | |
(ii) Substructure | : | Pier, Piercap & Abutment | |
(iii) Superstructure | : | PSC Solid Slab(M-40 grade concrete) | |
(iv) General Items | : | Strip seal Expansion Joint, Elastomeric bearing. | |
09 | Name of Contractor | : | Ajay Protech Pvt. Ltd. |
10 | Name of Design Consultant | : | (Pankaj Patel & Associates, Ahmadabad ) Pankaj M Patel Consultant Pvt Ltd., Ahmadabad |
11 | Name of Project Management Consultant | : |
---- |
12 | Name of Third Party Inspection (T.P.I.) | : | Indian Register of Shipping, Mumbai |