Skip to main content

1 Location Construction of swimming pool at T.P.S. No .4, F.P.No.M/3 (Ashwinikumar-Navagam), Surat.
2 Total Plot Area 3600Sq.mts.
3 Estimate Sanctioned General Board Res.No.241/96, Dtd-29/5/96
4 Tender Sanctioned Standing Committee Reso.No.307/97, Dtd. 18/2/97
5 Time Limit 11 (Eleven) Months
6 Date of Completion 23/1/99
7 Total Project Cost
A Civil Works Rs. 1,03,27,360.00
B Electrification Works Rs. 7,34,180.00
C Filtration Plant Works Rs. 34,46,628.00
G General Development and other Misc. Civil works i.e. main entrance gate, granite platform, entrance granite works, compound wall etc. 15.00.000.00
Total Rs. 1,45,08,168.00
8 Project Details
A Racing and Diving Pool
. Size 25.00 mt x 25.00 mt. x 1.07 mt to 5.00 mt.
  Capacity 17,40,OOOLtrs.
  Lane Eight
  Spring Board 1.00 mt and 3.00 mt . (Height)
  Diving Board 1.00 mt., 3.00 mt., 5.00 mt. (Height)
  Take off platform Eight
  Ladder Four
B Baby Swimming Pool
  Size 15.00 mt x 10.00 mt. x 0.60 mt to 0.90 mt.
  Capacity 1,12,500 Ltrs.
C  Main Building
  Waiting Hail 1
  Office 1
  Store Room 1
  Filtration Plant Room 1
  Shower 17
  Locker Room 1
  Open Shower 12
  Toilet 3
D Balancing Tank
  Capacity 85,000 Ltrs.
E Filteration Plant
  Pressure filter unit. 2.40 mt. dia x 5.65 mt length horizontal Type 
  Pump 2 Nos. Capacity - 270 Cmt/hr.
  Blower 1 No.
  Chlorination and Alum Dosing Equipment  1 No.