Skip to main content

Active Tenders


    1. 1

      Supply of BRASS CLADED BEARING on ARC base at HWW Varachha.

      Start Date: 11-08-2017 11:00| End Date: 19-08-2017 18:00
      Availability: Closed | Submit within: 3 Day(s)
    2. 2

      Supply of L & T make & MKTD Spares under Annual Rate Contract at H.W.W.Varachha, S.M.C. for Three years. (3rd Attempt).

      Start Date: 11-08-2017 11:00| End Date: 19-08-2017 18:00
      Availability: Closed | Submit within: 3 Day(s)
    3. 3

      Supply of C & S make & MKTD Spares under Annual Rate Contract at H.W.W.Varachha, S.M.C. for Three years. (3rd Attempt).

      Start Date: 11-08-2017 11:00| End Date: 19-08-2017 18:00
      Availability: Closed | Submit within: 3 Day(s)
    4. 4

      Supply of Various Size of Cables/Wires on Annual Rate Contract basis for the Period of Three years at Head Water Works.

      Start Date: 11-08-2017 11:00| End Date: 19-08-2017 18:00
      Availability: Closed | Submit within: 3 Day(s)
    5. 5

      Maintenance/repairing of Pot-Hole on different bridges at various location of Surat City Area.(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 24-07-2017 17:00| End Date: 21-08-2017 17:00
      Availability: Today | Submit within: Today
    6. 6

      Annual rate Contract for Maintenance work of Civil Items for different bridges at various location of Surat City Area.(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 24-07-2017 17:00| End Date: 21-08-2017 17:00
      Availability: Today | Submit within: Today
    7. 7

      Annual rate Contract for washing of different bridges at various location of Surat City Area.(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 24-07-2017 17:00| End Date: 21-08-2017 17:00
      Availability: Today | Submit within: Today
    8. 8

      Providing and Fixing of M.S.pipe railing on existing crash barrier for R.O.B. on L.C.426 in South East Zone of S.M.C.(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 24-07-2017 17:00| End Date: 21-08-2017 17:00
      Availability: Today | Submit within: Today
    9. 9

      "Tender for Annual Maintenance Contract of Handy Set Thermal Fogging Machines & Vehicle Mounted Thermal Fogging Machines."(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 10-08-2017 11:00| End Date: 22-08-2017 17:00
      Availability: 1 Day(s) | Submit within: 1 Day(s)
    10. 10

      "Tender for Annual Maintenance Contract of Microscope." (Through tendering only Check http://smc.nprocure.com only)

      Start Date: 10-08-2017 11:00| End Date: 22-08-2017 17:00
      Availability: 1 Day(s) | Submit within: 1 Day(s)
    11. 11

      Tender for supply of Eqipments/Instruments for Pediatric & Burns Department of Maskati Charitable Hospital, Surat.(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 11-08-2017 10:30| End Date: 23-08-2017 17:00
      Availability: 2 Day(s) | Submit within: 2 Day(s)
    12. 12

      Providing & Fixing Chainlink Fencing Including Civil Work on Various Existing Road Divider at Motavarachha - Sarthana Area in East (Varachha) Zone.(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 10-08-2017 11:00| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    13. 13

      Construction of Ward Office at T.P.S.No.20 (Nanavarachha-Kapadra), F.P.No.01 in East (Varachha) Zone.(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 10-08-2017 11:00| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    14. 14

      Development work of Nanavarachha Gamtal in East (Varachha) Zone.(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 10-08-2017 11:00| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    15. 15

      Construction of C.C.pavement and allied works including footpath, street light, landscaping & horticulture etc.from Anuvratdhwar junction to Jamnada park within Surat City Under Package-16. Chainage (0+000 to 3+000).(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 10-08-2017 10:30| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    16. 16

      Construction of C.C.pavement and allied works including footpath, street light, landscaping, canal lining and horticulture etc.from Palanpor gam canal culvert to Bhesan road within Surat City Under Package-15. Chainage (2+600 to 4+450).(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 10-08-2017 10:30| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    17. 17

      Construction of Shopping Centre in T.P.S.No.60 (Puna), F.P.No.17 (Sews) in East (Varachha) Zone.(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 10-08-2017 11:00| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    18. 18

      Labour work for Conveying, Lowering, Laving and Jointing of Sprirally Submerged Are Welded 800mm dia MS Feeder Line from Lal Darwaja WDS to existing water supply line at Katargam Darwaja of Central Zone Are, Surat.(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 11:00| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    19. 19

      Transportation of Empty/Filled Chlorine Tonner/Cylinder from manufacturer works to different water works of Surat Municipal Corporation on Annual Rate Contract basis and Transporation of Poly Aluminimum Chlorider (PAC) in powder for (25 Kg packing) from GACL (Dahej/Vadodara) to various water works of Surat Municipal Corporation (2nd Attempt).(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 11:00| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    20. 20

      All in All Operation and Maintenance work for the Bhestan (SE-2) Water Distribution Station of Surat Municipal Corporation. (2nd Attempt).(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 11:00| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    21. 21

      Construction of road layers from sub grade to binder/wearing course having width 24.00 mt.Below T.P.road with Internal Society Road reinstate of trench line falling line falling in South West Zone of surat city by contractor's own Batch mix type hot mix plant and WMM plant to be installed within surat city limit with sensor operator paver finisher including construction/repair of footpat, divider, water table and providing & laying/ fixing of pavement markings, road studs, road signages with other traffic safety measures. (Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 10:30| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    22. 22

      Construction of road layers from sub grade to binder/wearing course having width 24.00 mt.Below T.P.road with Internal Society Road and reinstate of trench line falling line falling in South West Zone of surat city by contractor's own Batch mix type hot mix plant and WMM plant to be installed within surat city limit with sensor operator paver finisher including construction/repair of footpat, divider, water table and providing & laying/ fixing of pavement markings, road studs, road signages with other traffic safety measures. (Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 10:30| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    23. 23

      Construction of road layers from sub grade to binder/wearing course having width 24.00 mt.and above falling in South Zone of surat city by contractor's own Batch mix type hot mix plant and WMM plant to be installed within surat city limit with sensor operator paver finisher including construction/repair of footpat, divider, water table and providing & laying/ fixing of pavement markings, road studs, road signages with other traffic safety measures. (Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 10:30| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    24. 24

      Construction of road layers from sub grade to binder/wearing course having width 24.00 mt.below only T.P.road falling in South Zone of surat city by contractor's own Batch mix type hot mix plant and WMM plant to be installed within surat city limit with sensor operator paver finisher including construction/repair of footpat, divider, water table and providing & laying/ fixing of pavement markings, road studs, road signages with other traffic safety measures. (Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 10:30| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    25. 25

      Construction of road layers from sub grade to binder/wearing course having width 24.00 mt.below ,Internal Society road and reinstate of trench line falling in Sub Zone-3,4 & 5 (South part) of South Zone of surat city by contractor's own Batch mix type hot mix plant and WMM plant to be installed within surat city limit with sensor operator paver finisher including construction/repair of footpat, divider, water table and providing & laying/ fixing of pavement markings, road studs, road signages with other traffic safety measures. (Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 10:30| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    26. 26

      Construction of road layers from sub grade to binder/wearing course having width 24.00 mt.below ,Internal Society road and reinstate of trench line falling in Sub Zone-1,2 (North part) of South Zone of surat city by contractor's own Batch mix type hot mix plant and WMM plant to be installed within surat city limit with sensor operator paver finisher including construction/repair of footpat, divider, water table and providing & laying/ fixing of pavement markings, road studs, road signages with other traffic safety measures. (Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 10:30| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    27. 27

      Construction of road layers from sub grade to binder/wearing course having width 24.00 mt.and above falling in East Zone of surat city by contractor's own Batch mix type hot mix plant and WMM plant to be installed within surat city limit with sensor operator paver finisher including construction/repair of footpat, divider, water table and providing & laying/ fixing of pavement markings, road studs, road signages with other traffic safety measures. (Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 10:30| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    28. 28

      Construction of road layers from sub grade to binder/wearing course having width 24.00 mt.below T.P.road and Society road falling in East Zone (Sub Zone A) of surat city by contractor's own Batch mix type hot mix plant and WMM plant to be installed within surat city limit with sensor operator paver finisher including construction/repair of footpat, divider, water table and providing & laying/ fixing of pavement markings, road studs, road signages with other traffic safety measures. (Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 10:30| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    29. 29

      Construction of road layers from sub grade to binder/wearing course having width 24.00 mt.below T.P.road and Society road falling in East Zone (Sub Zone B) of surat city by contractor's own Batch mix type hot mix plant and WMM plant to be installed within surat city limit with sensor operator paver finisher including construction/repair of footpat, divider, water table and providing & laying/ fixing of pavement markings, road studs, road signages with other traffic safety measures. (Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 10:30| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    30. 30

      Construction of road layers from sub grade to binder/wearing course having width 24.00 mt.below only New T.P.road and Widening of existing road falling in East Zone (Sub Zone A) of surat city by contractor's own Batch mix type hot mix plant and WMM plant to be installed within surat city limit with sensor operator paver finisher including construction/repair of footpat, divider, water table and providing & laying/ fixing of pavement markings, road studs, road signages with other traffic safety measures. (Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 10:30| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    31. 31

      Construction of road layers from sub grade to binder/wearing course having width 24.00 mt.and above falling in West Zone of surat city by contractor's own Batch mix type hot mix plant and WMM plant to be installed within surat city limit with sensor operator paver finisher including construction/repair of footpat, divider, water table and providing & laying/ fixing of pavement markings, road studs, road signages with other traffic safety measures. (Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 10:30| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    32. 32

      Construction of road layers from sub grade to binder/wearing course having width 24.00 mt.and above falling line falling in South West Zone of surat city by contractor's own Batch mix type hot mix plant and WMM plant to be installed within surat city limit with sensor operator paver finisher including construction/repair of footpat, divider, water table and providing & laying/ fixing of pavement markings, road studs, road signages with other traffic safety measures. (Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 10:30| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    33. 33

      Pay and Park at Ward No-13 (Athwa) Nondh No-2042 (Athwa-Chopato).(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 12-08-2017 11:00| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    34. 34

      Pay and Park at at T.P.Scheme No.4 (Ashwanikumar-Navagaam), F.P.No.-269 Paikee.(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 12-08-2017 11:00| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    35. 35

      Pay and Park at Aquarium (Machhali Ghar), Pal.(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 12-08-2017 11:00| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    36. 36

      Providing and Laying V.D.S.Concrete at Bombay Colony Vasahat at T.P.S.No.17 (Fulpada), F.P.No.76 at East (Varachha) Zone.(2nd Attempt).(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 10-08-2017 11:00| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    37. 37

      Construction of road layers from sub grade to binder/wearing course having width 24.00 mt.below only T.P.road recarpet of resi. Soc. and reinstate of trench line falling line falling in West Zone of surat city by contractor's own Batch mix type hot mix plant and WMM plant to be installed within surat city limit with sensor operator paver finisher including construction/repair of footpat, divider, water table and providing & laying/ fixing of pavement markings, road studs, road signages with other traffic safety measures. (Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 10:30| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    38. 38

      Construction of road layers from sub grade to binder/wearing course having width 24.00 mt.below exclusively Internal Society road only falling line falling in West Zone of surat city by contractor's own Batch mix type hot mix plant and WMM plant to be installed within surat city limit with sensor operator paver finisher including construction/repair of footpat, divider, water table and providing & laying/ fixing of pavement markings, road studs, road signages with other traffic safety measures. (Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 10:30| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    39. 39

      All in All Operation and Maintenance work for the Godadra (SE-4) Water Distribution Station of Surat Municipal Corporation. (2nd Attempt).(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 11:00| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    40. 40

      Labour work for Conveying, Lowering, Laying Spirally Submerged Arc.Welded different dia from 508 mm to 1524mm MS Feeder Line and Common Header Line for Lal Darwaja WDS and Connecting to Existing Line for Central Zone Area, Surat.(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 11:00| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    41. 41

      Construction of Compund Wall T.P.S.No.69 (Godadhara-Dindoli), Block No.150, ESR-SE-2 Campus & Construction & of Security Cabin in ESR-SE-2-10-11 Campus in South East Zone Area, Surat.(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 11:00| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    42. 42

      Repairing of Godbole type Automatic gate by replacing Rubber seal, Stopper,Bracket, Stopper Pad, Top horizontal Girder, Hoisting Chain & Bracket etc., and replacing rubber Seal of stop log gate at Rander Causeway of Surat Municipal Corporation with three years O & M.(2nd Attempt).(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 11:00| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    43. 43

      Construction of road layers from sub grade to binder/wearing course having width 24.00 mt.below only T.P.road falling in West Zone of surat city by contractor's own Batch mix type hot mix plant and WMM plant to be installed within surat city limit with sensor operator paver finisher including construction/repair of footpat, divider, water table and providing & laying/ fixing of pavement markings, road studs, road signages with other traffic safety measures. (Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 10:30| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    44. 44

      Construction of road layers from sub grade to binder/wearing course having width 24.00 mt.below only New T.P.road and Widening of existing road falling in East Zone (Sub Zone B) of surat city by contractor's own Batch mix type hot mix plant and WMM plant to be installed within surat city limit with sensor operator paver finisher including construction/repair of footpat, divider, water table and providing & laying/ fixing of pavement markings, road studs, road signages with other traffic safety measures. (Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 10:30| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    45. 45

      Construction of road layers from sub grade to binder/wearing course having width 24.00 mt.below Internal Society raod and reinstate of trench line falling in East Zone (Sub Zone A) of surat city by contractor's own Batch mix type hot mix plant and WMM plant to be installed within surat city limit with sensor operator paver finisher including construction/repair of footpat, divider, water table and providing & laying/ fixing of pavement markings, road studs, road signages with other traffic safety measures. (Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 10:30| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    46. 46

      Construction of road layers from sub grade to binder/wearing course having width 24.00 mt.below Internal Society raod and reinstate of trench line falling in East Zone (Sub Zone B) of surat city by contractor's own Batch mix type hot mix plant and WMM plant to be installed within surat city limit with sensor operator paver finisher including construction/repair of footpat, divider, water table and providing & laying/ fixing of pavement markings, road studs, road signages with other traffic safety measures. (Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 10:30| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    47. 47

      Construction of road layers from sub grade to binder/wearing course having width 24.00 mt.and above falling in South East Zone of surat city by contractor's own Batch mix type hot mix plant and WMM plant to be installed within surat city limit with sensor operator paver finisher including construction/repair of footpat, divider, water table and providing & laying/ fixing of pavement markings, road studs, road signages with other traffic safety measures. (Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 10:30| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    48. 48

      Construction of road layers from sub grade to binder/wearing course having width 24.00 mt.below only T.P.road falling in South East Zone of surat city by contractor's own Batch mix type hot mix plant and WMM plant to be installed within surat city limit with sensor operator paver finisher including construction/repair of footpat, divider, water table and providing & laying/ fixing of pavement markings, road studs, road signages with other traffic safety measures. (Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 10:30| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    49. 49

      Construction of road layers from sub grade to binder/wearing course having width 24.00 mt.below, Internal Society Road and reinstate of trench line falling in South East Zone of surat city by contractor's own Batch mix type hot mix plant and WMM plant to be installed within surat city limit with sensor operator paver finisher including construction/repair of footpat, divider, water table and providing & laying/ fixing of pavement markings, road studs, road signages with other traffic safety measures. (Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 10:30| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    50. 50

      Construction of road layers from sub grade to binder/wearing course having width 24.00 mt.and above & reinstate of trench line falling in North Zone of surat city by contractor's own Batch mix type hot mix plant and WMM plant to be installed within surat city limit with sensor operator paver finisher including construction/repair of footpat, divider, water table and providing & laying/ fixing of pavement markings, road studs, road signages with other traffic safety measures. (Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 10:30| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    51. 51

      Construction of road layers from sub grade to binder/wearing course having width 24.00 mt.below T.P.Road with internal Society road & reinstate of trench line falling in North Zone of surat city by contractor's own Batch mix type hot mix plant and WMM plant to be installed within surat city limit with sensor operator paver finisher including construction/repair of footpat, divider, water table and providing & laying/ fixing of pavement markings, road studs, road signages with other traffic safety measures. (Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 10:30| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    52. 52

      Construction of road layers from sub grade to binder/wearing course having width 24.00 mt.below T.P.Road with internal Society road & reinstate of trench line falling in North Zone of surat city by contractor's own Batch mix type hot mix plant and WMM plant to be installed within surat city limit with sensor operator paver finisher including construction/repair of footpat, divider, water table and providing & laying/ fixing of pavement markings, road studs, road signages with other traffic safety measures. (Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 10:30| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    53. 53

      Development work of Sarthana Gamtal in East (Varachha) Zone.(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 10-08-2017 11:00| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    54. 54

      Annual Rate Contract for Maintenance and Repairing work of Various Road Dividers in Sub Zone-A Area in East (Varachha) Zone.(2nd Attempt).(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 10-08-2017 11:00| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    55. 55

      Development of Puna Gamtal in East (Varachha) Zone.(2nd Attempt).(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 10-08-2017 11:00| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    56. 56

      Annual Rate Contract for Construction of Compound Wall at Various Reservation Plots in Sub Zone-B inEast (Varachha) Zone.(2nd Attempt).(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 10-08-2017 11:00| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    57. 57

      Construction of Two New Rooms for Anganwadi in School No.136/143 (Shreyash School) at Vishal nagar, T.P.15 (Fulpada), F.P.No.110 East (Varachha) Zone.(2nd Attempt).(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 10-08-2017 11:00| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    58. 58

      Gamtal Development of Fulpada Area in East (Varachha) Zone.(2nd Attempt).(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 10-08-2017 11:00| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    59. 59

      Annual Rate Contract for Maintenance and Reparing work in Different Municipal Gardens Existing in Subzone-B area in East (Varachha) Zone.(2nd Attempt).(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 10-08-2017 11:00| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    60. 60

      Annual Rate Contract for Maintenance and Reparing work in Different Municipal Gardens Existing in Subzone-A area in East (Varachha) Zone.(2nd Attempt).(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 10-08-2017 11:00| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    61. 61

      Construction of road layers from sub grade to binder/wearing course having width 24.00 mt. below and reinstate of trench line falling in central Zone (South) of surat city by contractor's own Batch mix type hot mix plant and WMM plant to be installed within surat city limit with sensor operator paver finisher with other traffic safety measures. (Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 10:30| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    62. 62

      Construction of road layers from sub grade to binder/wearing course having width 24.00 mt. below and reinstate of trench line falling in central Zone (North) of surat city by contractor's own Batch mix type hot mix plant and WMM plant to be installed within surat city limit with sensor operator paver finisher with other traffic safety measures. (Through tendering only Check http://smc.nprocure.com only)

      Start Date: 08-08-2017 10:30| End Date: 24-08-2017 17:00
      Availability: 3 Day(s) | Submit within: 3 Day(s)
    63. 63

      Repairing and Maintanance work of Footpath, Divider, Chainlizer and Activity area of Sub Zone-1 in South Zone (Udhna), Surat.(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 16-08-2017 11:00| End Date: 28-08-2017 17:00
      Availability: 7 Day(s) | Submit within: 7 Day(s)
    64. 64

      Construction of Footpath Signage, Lane marking etc for Road Beautification of Dindoli Junction to Vikash nagar junction in T.P.Scheme No.01 (Udhna-Majura) and T.P.Scheme No.2 (Udhna) in South Zone (Udhna), Surat.(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 16-08-2017 11:00| End Date: 28-08-2017 17:00
      Availability: 7 Day(s) | Submit within: 7 Day(s)
    65. 65

      Construction of Footpath Signage, Lane marking etc for Road Beautification of 36.00 mtr.wide road from Sosyo corcle to hedgevar-Bamroli road in South Zone (Udhna), Surat.(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 16-08-2017 11:00| End Date: 28-08-2017 17:00
      Availability: 7 Day(s) | Submit within: 7 Day(s)
    66. 66

      Providing and applying Hot Thermoplastic road at Sub Zone-3 and 5 area in South Zone (Udhna) within City Limit area, Surat.(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 16-08-2017 11:00| End Date: 28-08-2017 17:00
      Availability: 7 Day(s) | Submit within: 7 Day(s)
    67. 67

      Construction of plain Cement Concrete Pavement on Internal Road of Indira nagar Society at Block No.183 in D.P.S.No.63 (Vadod) in South Zone (Udhna), Surat.(5th Attempt) (Through tendering only Check http://smc.nprocure.com only)

      Start Date: 16-08-2017 11:00| End Date: 28-08-2017 17:00
      Availability: 7 Day(s) | Submit within: 7 Day(s)
    68. 68

      Construction of plain Cement Concrete Pavement on Internal Road of Vishal nagar Society at R.S.No.172 paikee is D.P.S.No.63 (Vadod) in South Zone (Udhna), Surat.(5th Attempt) (Through tendering only Check http://smc.nprocure.com only)

      Start Date: 16-08-2017 11:00| End Date: 28-08-2017 17:00
      Availability: 7 Day(s) | Submit within: 7 Day(s)
    69. 69

      Repairing and Maintanance work of footpath, Divider, Channeliser and Activity area of Sub Zone-4 in South Zone (Udhna), Surat.(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 16-08-2017 11:00| End Date: 28-08-2017 17:00
      Availability: 7 Day(s) | Submit within: 7 Day(s)
    70. 70

      Construction of Footpath, Signage, Parking etc for road Beautification of 25.00 mt. wide T.P.road from NF1 Garden to Siddhath nagar in T.P.Scheme No.21 & 22 (Bhestan) in South Zone (Udhna), Surat.(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 16-08-2017 11:00| End Date: 28-08-2017 17:00
      Availability: 7 Day(s) | Submit within: 7 Day(s)
    71. 71

      Maintainance and Repairing work of Existing Sewer Drainage line and Strom Drainage line, Manhole, Inlet, Chambers and Providing & Laying Sewer Drainage line & Strom Drainage line pipes, Mainhole, inlet Chambers as per Requirment in Old Bamroli and New Bamroli in South Zone (Udhna), Surat.(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 16-08-2017 11:00| End Date: 28-08-2017 17:00
      Availability: 7 Day(s) | Submit within: 7 Day(s)
    72. 72

      Construction of Suman School Building (Udiya Medium) at Open Grund of Krishna nagar School No.221 & 254 at T.P.Scheme No.57 (Pandesara), F.P.No.37, R-2 in South Zone (Udhana), Surat.(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 16-08-2017 11:00| End Date: 28-08-2017 17:00
      Availability: 7 Day(s) | Submit within: 7 Day(s)
    73. 73

      Construction of Shopping Centre at T.P.Scheme No.21 (Bhestan), F.P.No.2 Paikee in South Zone (Udhana), Surat.(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 16-08-2017 11:00| End Date: 28-08-2017 17:00
      Availability: 7 Day(s) | Submit within: 7 Day(s)
    74. 74

      Construction of Shopping Centre at T.P.Scheme No.21 (Bhestan), F.P.No.57 in South Zone (Udhana), Surat.(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 16-08-2017 11:00| End Date: 28-08-2017 17:00
      Availability: 7 Day(s) | Submit within: 7 Day(s)
    75. 75

      Construction of New Compound wall in place of Existing Settle Compound Wall Demolsh & make New 3.00 mtr. hight at F.P.No.1/A (H-15 Awas) of Existing Primary School, Health Center & Community Hall T.P.Scheme No.54 (Bhestan) in South Zone (Udhana), Surat.(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 16-08-2017 11:00| End Date: 28-08-2017 17:00
      Availability: 7 Day(s) | Submit within: 7 Day(s)
    76. 76

      Operation and Maintanance work of Pay & Use Toilet Block for Five Years time period at T.P.Scheme No.48 (Bhestan), F.P.No.87, Opp. NFI Garden in Sub Zone-2 in South Zone (Udhana), Surat.(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 16-08-2017 11:00| End Date: 28-08-2017 17:00
      Availability: 7 Day(s) | Submit within: 7 Day(s)
    77. 77

      Operation and Maintanance work of Pay & Use Toilet Block for Five Years below Railway Over Bridge Nr. Pramukh Park Society in Sub Zone-2 in South Zone (Udhana), Surat.(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 16-08-2017 11:00| End Date: 28-08-2017 17:00
      Availability: 7 Day(s) | Submit within: 7 Day(s)
    78. 78

      Development of Gabheni Gamtal (Phase-1) in South Zone (Udhana), Surat.(3rd Attempt).(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 16-08-2017 11:00| End Date: 28-08-2017 17:00
      Availability: 7 Day(s) | Submit within: 7 Day(s)
    79. 79

      Extension of Height of Existing compound wall and Reconstruction bent compound wall at Unn lake garden, Sub Zone-4 in South Zone (Udhna), Surat. (3rd Attempt).(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 16-08-2017 11:00| End Date: 28-08-2017 17:00
      Availability: 7 Day(s) | Submit within: 7 Day(s)
    80. 80

      Beautification of road from Piyush point junction to Daxeshwar Mahadev Temple T.{.Scheme No.57 Pandesara in South Zone (Udhna), Surat.(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 16-08-2017 11:00| End Date: 28-08-2017 17:00
      Availability: 7 Day(s) | Submit within: 7 Day(s)
    81. 81

      Construction of V.D.S.Concrete payement in Service Gullies Shri Ram nagar at T.P.Scheme No,.57 (Pandesara), R.S.No.5/2 in South Zone (Udhna), Surat.(2nd Attempt).(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 16-08-2017 11:00| End Date: 28-08-2017 17:00
      Availability: 7 Day(s) | Submit within: 7 Day(s)
    82. 82

      The work of Suppying and Fixing various mandatory, cautionary and informative retro reflective type sign boards, bollards and directional boards at Sub Zone-2 in South Zone (Udhna), Surat.(2nd Attempt).(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 16-08-2017 11:00| End Date: 28-08-2017 17:00
      Availability: 7 Day(s) | Submit within: 7 Day(s)
    83. 83

      Construction of Setting/Resetting of Stone paving work in internal Gullies of Prem Nagar and Bhedwad Dargah Slum Vasahat in Sub Zone-2 in South Zone (Udhna), Surat.(4th Attempt).(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 16-08-2017 11:00| End Date: 28-08-2017 17:00
      Availability: 7 Day(s) | Submit within: 7 Day(s)
    84. 84

      Construction of VDS concrete pavement in Slum Vasahat Service Gullies of Nagshen nagar in South Zone (Udhna), Surat.(5th Attempt).(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 16-08-2017 11:00| End Date: 28-08-2017 17:00
      Availability: 7 Day(s) | Submit within: 7 Day(s)
    85. 85

      Providing and Fixing Cat eye and Bollard on various roads in Sub Zone-2 at South Zone (Udhna), Surat.(4th Attempt).(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 16-08-2017 11:00| End Date: 28-08-2017 17:00
      Availability: 7 Day(s) | Submit within: 7 Day(s)
    86. 86

      Providing and constructing RCC Precast kerb and Rubber moulded paver block footpath on both side of city industries to udhana road No.6 of 15.00 mt. wide road Nr.Swaminarayan Temole at Udhana Sangh area South Zone (Udhna), Surat.(5th Attempt).(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 16-08-2017 11:00| End Date: 28-08-2017 17:00
      Availability: 7 Day(s) | Submit within: 7 Day(s)
    87. 87

      Construction of VDS concrete Pavement in Service Gullies of Prabhu nagar and Vikas nagar at T.P.Scheme No.2 (Udhana), F.P.No.18 and 17 in South Zone (Udhna), Surat.(3rd Attempt).(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 16-08-2017 11:00| End Date: 28-08-2017 17:00
      Availability: 7 Day(s) | Submit within: 7 Day(s)
    88. 88

      Construction of VDS concrete Pavement in Service Gullies of Luhar Fallyu, Vallabhavasahat and Masstan nagr Moje Udhana Udhyognagar Sangh in South Zone (Udhna), Surat.(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 16-08-2017 11:00| End Date: 28-08-2017 17:00
      Availability: 7 Day(s) | Submit within: 7 Day(s)
    89. 89

      Construction of School Building in Place of Old Existing School Building at Unn Gam in South Zone (Udhna), Surat.(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 16-08-2017 11:00| End Date: 28-08-2017 17:00
      Availability: 7 Day(s) | Submit within: 7 Day(s)
    90. 90

      Proposed Development of Vadod Gamtal in South Zone (Udhna), Surat. (3rd Attempt).(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 16-08-2017 11:00| End Date: 28-08-2017 17:00
      Availability: 7 Day(s) | Submit within: 7 Day(s)
    91. 91

      Development of Group Housing facilities at Dumbhal Tenements on F.P.No.18/A, T.P.Scheme No.33 (Dumbhal) on PPP basis under Redevelopment of of Public Housing Scheme-2016). (2nd Attempt).(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 01-08-2017 10:30| End Date: 07-09-2017 17:00
      Availability: 17 Day(s) | Submit within: 17 Day(s)
    92. 92

      Development of Group Housing facilities at Dumbhal Tenements on F.P.No.18/A, T.P.Scheme No.33 (Dumbhal) on PPP basis under Redevelopment of Public Housing Scheme-2016. (2nd Attempt).(Through tendering only Check http://smc.nprocure.com only)

      Start Date: 01-08-2017 10:30| End Date: 07-09-2017 17:00
      Availability: 17 Day(s) | Submit within: 17 Day(s)