Construction of Shree Nathji Fly Over Bridge on Varachha main Road, Surat
| 1. | Location | On Varachha main road |
| 2. | River/Nala/Creek | N .A. |
| 3. | Lane | Four lane |
| 4. | Year of construction | Dec. - 2003 |
| 5. | Cost | Rs. 2998 Lacs |
| 6. | Details of Bridge | |
| (i) Length of fly over Bridge | 2753 Mtr. | |
| (ii) Number of Spans | 128 nos. (Each span of 20 mt. Avg.length) | |
| (iii) Length of Up Ramp (At Hirabaug junction) | 465 mt. | |
| (iv) Carriage Way | 7.5 mtr. On both side | |
| (v) Length of Returns | 110 mtr. towards Kapodra side 120 mtr towards Surat side |
|
| 7. | (I) Design Discharge | N.A. |
| (ii) Design H.F.L. | N.A. | |
| (iii) Type of bridge | Fly Over Bridge | |
| 8. | Structural Details : | |
| (i) Foundation. | Isolated Open Footing | |
| (ii) Substructure | R.C.C. Cast in Situ Single Rectangular Pier (3 x 1.5 mt.) | |
| (iii) Superstructure | R.C.C. Cast in Situ Box type | |
| (iv) General Items | Anti crash barrier, Retaining wall. | |
| 9. | Name of Contractor | M/s. Ranjit construction Co., Mehsana. |
| 10. | Name of Design Consultant | STUP Consultant Pvt. Ltd., Mumbai |
| 11. | Name of Project Management Consultant | Technogem Consultant Pvt. Ltd., Thane |
| 12. | Feasibility Prepared By | Sardar Vallabhbhai Regional Engineering College, Surat. |