RES Projects Completed

Brief Details of Various RES Power Generating Plants up to Mar-2021:

Please scroll/drag below block to view whole data
Sr. No. Brief Details of Power Plant Commissioned on Capacity of the Plant Captive Use / Sale Break-up of WTGs/ Cell Modules Total Capital Cost of Power Plant (Rs. Cr.)
1 3 MW WPP @ Adodar, Dist: Porbandar 02/Nov/2010 3.00 MW Captive Use at 2 Sites 2 No(s) x 1.5 MW 18.44
2 8.4 MW WPP @ Bhanwad, Dist: Jamnagar 17/Jul/2013 8.40 MW Captive Use at 6 Sites 4 No(s) x 2.1 MW 52.18
3 6.3 MW WPP @ Ratdi, Dist: Porbandar 29/Sep/2014 6.30 MW Captive Use at 9 Sites 3 No(s) x 2.1 MW 41.52
4 12.6 MW WPP @ Nakhatrana, Dist: Kutchh 30/Jun/2016 12.60 MW Captive Use at 54 Sites 6 No(s) x 2.1 MW 90.06
5 2.1 MW WPP @ ROH 136, Nakhatrana, Dist: Kutchh 31/Mar/2019 2.10 MW Captive Use at 9 Sites 1 No(s) x 2.1 MW 13.52
** Total Wind Power Plants ** 32.40 MW Captive Use at 63 Sites ** 215.71
6 100 kWp SPV Based SPP @ Science Centre, SMC- Surat 18/Jan/2013 100 kWp Sale to TPL 440 No(s) x 230 Wp 0.81
7 Aggregate 750 kWp SPV Based SPP @ 14 Sites of SMC 27/Mar/2014 750 kWp Sale to TPL 3,000 No(s) x 250 Wp 6.73
8 Aggregate 540 kWp SPV Based SPP @ 12 Sites of SMC 23/Mar/2015 540 kWp Sale to TPL 1,940 No(s) x 250 Wp 4.40
9 Aggregate 3605 kWp SPV Based SPP @ 10 Sites of SMC 02/Jul/2017 3,605 kWp Captive/ Self Use at 10 Sites 11,265 No(s) x 320 Wp 18.40
10 Aggregate 1000 kWp SPV Based SPP @ 17 Sites of SMC 25/Jan/2019 1,000 kWp Captive/ Self Use at 17 Sites 3,080 No(s) x 325 Wp 4.32
** Total Solar Power Plants ** 5,995 kWp ** ** 34.65